Carquinez Monthly Progress
for December, 2000
A view of the south
anchorage and pier one
A view of Drill operation
setup at T3
Excavation work is done
at night, north anchorage
Lifting 150' 3 meter pile at T3
Picking & swinging IHC hammer off DB5
Driving twelfth (last) 3 meter pile
through template at tower 3
Wirth drill set up for drilling 3
meter piles at Tower 3
Slurry barges move to Tower 3
for to begin drilling rock sockets
South anchorage lower tier
excavation support frame work
Foundation Constuctors
driving & splicing 30" piles (South Anchorage)