Carquinez Monthly Progress
for December, 2000


A view of the south
anchorage and pier one

A view of Drill operation
setup at T3

Excavation work is done
at night, north anchorage

Lifting 150' 3 meter pile at T3

Picking & swinging IHC hammer off DB5

Driving twelfth (last) 3 meter pile
through template at tower 3

Wirth drill set up for drilling 3
meter piles at Tower 3

Slurry barges move to Tower 3
for to begin drilling rock sockets

South anchorage lower tier
excavation support frame work

Foundation Constuctors
driving & splicing 30" piles (South Anchorage)
 