Carquinez Monthly Progress
for January, 2001


A view on Pier P1 and
the Trestle out to Tower T2

A view of Tower T3 piles
and access work in progress

Swinging rebar cage over
a 3 meter pile for splicing

Pouring a 3 meter pile and
setting up to drill another at Tower T3

Rebar cages being fabricated
at Mare Island

Looking down at the south anchorage
from the top of Pier P1

North anchorage getting deeper.
(13m deep and at 35.5m level)

Pier P1 west concrete pour and Pier P1
east striping forms final lift. (seventh)

Installing whalers and struts in lower tier shoring. (south anchorage)

Driving the last of the batter pile in the south
anchorage and drilling out pile at bent B7
 
HBG Constructors - A Design-Build and Construction Company Articles catalogue