Foothill Toll Road-South

Location: Orange County



This HBG Flatiron led joint venture begins its second design-build contract for the Transportation Corridor Agencies (TCA). The planned $644 million Foothill Toll Road-South is the final segment of the TCA's 67-mile public toll road network and will complete Orange County's regional highway system.

The project is being delivered in three phases. Phase 1 includes the preliminary design necessary to complete the environmental review process, including procuring permits. Phases 2 and 3 consist of final design and construction, which began in 2001.

Project Features:

  • 16-mile, four-to-six lane, limited-access toll road

  • median wide enough to accommodate future auxiliary lanes or transit option

  • fully directional interchange with Interstate 5 and six arterial interchanges

  • two mainline and six ramp toll plazas

  • state-of-the-art toll collection system

  • sophisticated traffic management system

  • numerous wildlife crossings

You can find out more at www.tcagencies.com
 