Project Overview:

Interbeton, as a joint venture member with J.F. White and Slattery Skanska, constructed the $160 million I-93/ Massachusetts Avenue interchange, an integral part of the Central Artery Project. This work for the Massachusetts Turnpike Authority encompassed demolishing elevated parts of I-93 and rebuilding new viaducts. This project was completed in November 2000.

Project Features:

Removal of existing viaducts and construction of 6 new steel viaducts


3 new auxiliary bridges


1,760 foot-long temporary bridge


4.6 miles of new at-grade roadway


2 new stormwater pump stations


Excavation, removal and disposal of contaminated material

Interesting Facts:

Materials used on this project included 63.8 miles of steel pipe piles, 220 steel tub girders, 216 precast I-beams, 101,791 cubic yards of concrete and more than 8 million pounds of structural reinforcing steel

Project Related Links:

The Official Big Dig website
http://www.bigdig.com
and
http://www.bigdig.com/thtml/contract/c12a3.htm

 

back to top

archived projects
     carolina bays
     580/680
     benicia
     thompson creek
     i-93/mass. ave.
     sagadahoc
     new mexico 44
     mission valley
     eastern toll road
     i-5 corridor
     glenwood canyon

 
employee login       site map        contact us        home
 
Sitemap
HBG Constructors - A Design-Build and Construction Company Articles catalogue