Project Overview:
HBG Flatiron
is the managing partner of Saddleback Constructors, the joint
venture designing and building the Foothill Transportation
Corridor-South (FTC-South). This new 16 mile four-to-six lane,
limited access toll road will extend the Foothill Corridor
from Oso Parkway south to Interstate 5 in the San Clement
area.
This $644 million design/build contract with the Transportation
Corridor Agencies (TCA) is being delivered in 3 phases. Phase
1 includes the preliminary design necessary to complete the
environmental review process, including procuring permits.
Phases 2 and 3 consist of final design and construction activities
targeted to begin in 2004. The FTC-South is the final segment
of the TCA's 67-mile public toll road network and will complete
Orange County's regional highway system.
:: view
map

Project Features:
A four-lane facility and a median wide enough to include
future improvements, such as auxiliary lanes, truck climbing
lanes, mixed flow lanes and either HOV lanes or a transit
facility
A fully directional interchange with Interstate 5, six arterial
interchanges, numerous wildlife crossings and 2 mainline six
ramp toll plazas
A sophisticated traffic management system and a state-of-the-art
toll collection and violation enforcement system including
full-speed electronic toll collection