Project Overview:

The Utah Transit Authority proposed constructing a light rail transit system consisting of two major projects: The University LRT and the Medical Center LRT.

Beginning in 2000, HBG Flatiron led the design/build joint venture as part of SLC Rail Constructors for Utah Transit Authority's $89.4 million extension of Salt Lake City's light rail transit system. SLC Rail Constructors is a partnership with HBG Flatiron, Stacey and Witbeck Inc., Geneva Rock and CHS Designers.

After completing the project almost one year ahead of schedule, SLC Rail Constructors was chosen again to complete the $41 million design/build project for the Medical Center LRT.

What's New?

February/March 2003

The roadway for Segment 1 is complete, with full traffic access. Segment 3 is almost complete, with crews finishing track, curb and infill work. Segment 4 Wasatch Station foundations are in place, and the Segment 5 Medical Station foundations are underway.

January 2003

Roadway, track, station and foundation construction are ongoing in all five segments

Project is 40% complete and is progressing ahead of schedule

December 2002

Roadway and rail construction of Segment 1 is complete

Installation of OCS system in the spring

Segment 2 is closed to traffic, and roadway and track work construction are underway

Southern half of Segment 3 is complete and traffic has ben switched

Utility work at Wasatch station is complete and the trackway has been graded

November 2002

Segment 1 paving complete

The rail track has been replaced and the concrete in-fill around track is complete

October 2002

Crews completed Segment 1 roadwork, underground utilities and the track pass over the pedestrian undercrossing

Crews completed Segment 4 east side work and traffic has been switched to allow track work and west side construction to begin

Retaining walls have been completed to allow for the traffic shift

Project Features:

The University LRT includes 1.5 miles of new light rail from the University of Utah and Rice-Eccles Stadium to the University Medical Center

The Medical Center LRT will leave the Rice-Eccles Stadium parking lot, go up South Campus Drive, north on Wasatch Drive and proceed up Medical Drive ending adjacent to Primary Children's Hospital


Work includes:
  • Trackwork, three passenger stations, signalization, integrated
  • Traffic control and communications
  • Electric power supply and distribution (including traction power substations and overhead catenary system)
  • Extensive utility relocation, maintenance of high-density traffic, and roadway reconstruction


Project Related Links:

Ride Utah Transit Authority:
http://www.rideuta.com/trax/expansion/history.asp

 

back to top

back to current projects
current projects
   85/101 interchange
   knightdale bypass
   cooper river
   carquinez
   terminal roadways
   university light
   rail
   oakland
   routes 60/91/215
   foothill toll road
   route 56
   i-680/marina vista


employee login  :  site map  :  contact us  :  home  :  terms of use
 
Sitemap
HBG Constructors - A Design-Build and Construction Company Articles catalogue